Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities & Reclamation Works

Construction of 6,140m long seawall and reclamation of an area of about 150 hectare at the northeast of the Hong Kong International Airport for...

The Reclamation Works in Flota, Columbia

The reclamation works in Flota, Columbia with a dredged and reclaimed volume of 2.3 million m3.

SAUDI RAS AZ ZAWR PORT EPC PROJECT

The scope of work for this project is Engineering, Procurement and Construction (EPC) of the Port at RasAzZawr, as part of the infrastructure support...

Dredging and Reclamation Work of Livestock Terminal, Sudan

Project of Livestock Terminal is to be executed in 2 phases. Phase 1 is dredging of channel, port basin and trench, with total dredging...

The Design Parameters of the Approach Channel of Hambantota Port

The design parameters of The approach channel of Hambantota Port is as follow: Depth :-16m Length:1260m Width of channel bottom : 210m Construction area...

Sonaref Refinery Project Dredging for Marine Facilities, Angola

Dredging in a trapezoid area about 2000m long and 300m wide at the maximum width location, excavating the specified area a 15 meter deep...

Latest article

ECRL Project Achieves the Goal of “Half of the Time, Half of the Tasks”

0
2023 is the "tough year for civil construction" of the East Coast Rail Link (ECRL) project constructed by CHEC, and the project has ushered in the peak of civil construction. Centering on the annual plan of the project and the goal of the labor competition in the first half of the year, Divisions I-VII have comprehensively overfulfilled the goal of "Half of the Time, Half of the Tasks ", which added a bright color to the progress of the project.

The 8 Shenton Way Mixed-use Building Renovation Project in Singapore Starts the Test Pile...

0
Recently, the 8 Shenton Way Mixed-use Building Renovation Project in Singapore, undertaken by CHEC, has successfully entered the stage of test pile concrete pouring.

The Dungun River Super-large Bridge, a Key Control Project of ECRL, Successfully Closed

0
Recently, as the tower crane put the last bucket of concrete in place, ECRL has successfully completed the mid-span closure of the 108m-long continuous beam of the Dungun River Super-large Bridge, and the last "obstacle" of the T beam erection of the ECRL Division 4 has been broken through, and the T beam erection will usher in the important stage of fast construction.

The T-beam Erection of ROB24 Road Bridge of ECRL Division 6 Completed Successfully

0
The ROB24 Road Bridge, 260m long, consists of 12 spans and 72 T beams, including 40m-long T beams for the main line of the overpass railway.

The T-beam Erection of the First Super-large Bridge along the Line of ECRL Successfully...

0
Recently, the T-beam erection of No. 5 super-large bridge in Division 1 of ECRL Project has been successfully completed, marking the completion of T beam erection of the first super-large bridge along the whole line of the project.