Construction of A Container Terminal at New Mooring, Chittagong, Bangladesh

8943

This project is located at Chittagong Bangladesh. It comprises design and construction of 1000m length quay wall (total 5nos. berth with capacity of 30,000 tons, 200m length for each), 140,000 m2 container storage yard, roads & railways, terminal buildings, potable water & drainage system, electrical distribution and other accessory facilities.