Jetty Works of PLTU 3 JAWA TIMUR(2×350MW)TANJUNG AWAR-AWAR POWER PLANT

8520

The project includes one 12000DWT Gravity caisson coal import jetty (193m×25m), two rock hearting with concrete block armour breakwaters arranged as an encircled ring and total length is2359m,dredging quantity is about 1,500,000m3, 930m long revetment, one water intake.