New Container Terminal & Dredging Project in Sudan Port

8148

The project is located at the entrance of Sudan Port, planned with 2 nos. 70,000TEU Container Terminal and some dredging works. The total length of the terminal is 781m with -16m water depth. The body is planned to be double-decker hollow concrete cube structure, its revetment is about 1410.81m in length. Dredging for the foundation trench, turning basin, main channel and total dredging volume comes to 3.5million m3.