The HEFEI-WUHAN Passenger Special Railway Line

7976

The Macheng-Huangpi Section of Hefei-Wuhan Railway, with the total length of 52km, includes 4,000,000m3 earth and stone works, 5 extra large bridges, 20 large/mediumsized bridges and 3 tunnels.

The contractual period was 28 months. This railway line is a national first-class trunk line. It is a double-line electric railway with the designed speed of 200km/h.