GRN, Port of Lobito Extension Project Container Terminal

Extension Work--Container Terminal is located in Lobito, Angola. The length is 414 meters. Container Terminal includes 621 steel pipe piles, and the superstructure is...

Grn, Port of Lobito Extension Project Mineral Terminal

Extension Work--Mineral Terminal is located in Lobito, Angola. The length is 310 meters. Mineral Terminal includes 19 caissons which size is 18.7mx14.3mx17.3m and single...

New Container Terminal & Dredging Project in Sudan Port

The project is located at the entrance of Sudan Port, planned with 2 nos. 70,000TEU Container Terminal and some dredging works. The total length...

CMSA Container Terminal Phase 1-Stage 1A Civil Works in Manzanillo, Colima

This project is located at the Pacific coast city of Manzanillo, 800km away from Mexico City. This construction contract comprises the construction of Phase...

Maritime Works of PLTU 2 Jateng 1X660MW Adipala Project, Indonesia

The project includes one 35000DWT coal import jetty (234m×25m), two rock hearting with concrete block armour breakwaters , total length is 2105m, dredging quantity...

Latest article

ECRL Project Achieves the Goal of “Half of the Time, Half of the Tasks”

0
2023 is the "tough year for civil construction" of the East Coast Rail Link (ECRL) project constructed by CHEC, and the project has ushered in the peak of civil construction. Centering on the annual plan of the project and the goal of the labor competition in the first half of the year, Divisions I-VII have comprehensively overfulfilled the goal of "Half of the Time, Half of the Tasks ", which added a bright color to the progress of the project.

The 8 Shenton Way Mixed-use Building Renovation Project in Singapore Starts the Test Pile...

0
Recently, the 8 Shenton Way Mixed-use Building Renovation Project in Singapore, undertaken by CHEC, has successfully entered the stage of test pile concrete pouring.

The Dungun River Super-large Bridge, a Key Control Project of ECRL, Successfully Closed

0
Recently, as the tower crane put the last bucket of concrete in place, ECRL has successfully completed the mid-span closure of the 108m-long continuous beam of the Dungun River Super-large Bridge, and the last "obstacle" of the T beam erection of the ECRL Division 4 has been broken through, and the T beam erection will usher in the important stage of fast construction.

The T-beam Erection of ROB24 Road Bridge of ECRL Division 6 Completed Successfully

0
The ROB24 Road Bridge, 260m long, consists of 12 spans and 72 T beams, including 40m-long T beams for the main line of the overpass railway.

The T-beam Erection of the First Super-large Bridge along the Line of ECRL Successfully...

0
Recently, the T-beam erection of No. 5 super-large bridge in Division 1 of ECRL Project has been successfully completed, marking the completion of T beam erection of the first super-large bridge along the whole line of the project.