Lanzhou-Xining Section of Lanzhou-Xinjiang High-speed Railway Project

0
Lanzhou-Xinjiang High-speed Railway which the length is 1776 kms crossing plateau, mountainous region, desert and other complicated landforms and it is also an important...

EPC Contract for JUBA-NIMULE standard gauge railway

0
The construction of the railway line starts from south of Juba southward in South Sudan, all the way to the border city Nimule, with...

The Ampang (AMG) Line Extension Project – Track Works, Malaysia

0
The Ampang (AMG) Line Extension starts from Sri Petaling Station and ends at Putra Heights to serve the highly populated residential and commercial areas....

The HAERBIN-DALIAN Passenger Special Railway Line

0
This section of the railway project runs through JIlin, Heilongjiang and lining provinces in Notheeast China with a total length of 345.596km for the...

The Second Double Track Lines Of Lanzhou-Xinjiang Railway LSX-1 Section Works

0
Running through northwest part of China’s Gansu,Qinghai provinces and Xinjiang Uygur Autonomous Region,with a total length of 1776km,the design speed of over 200km/h,the second...

Good News for the New Year! The Sixth Division of the East Coast Rail...

0
At the beginning of the New Year, the sixth division of the East Coast Rail Link Project in Malaysia has good news! Under the guidance and support of the General Manager Department of the East Coast Rail Link Project and relevant departments of CHEC headquarters, and with the joint efforts of all the construction personnel of the sixth division, the actual output value of the sixth division (Section B) in the fourth quarter (Q4) was 11.37%, 109.08% of the planned quarterly output value (10.42%).

The NO.2 Liaojia Super Major Railway Bridge

0
The No.2 Liaojia Super Major Bridge of the Newly constructed Railway of Hangzhou-Changsha(Jiangxi Section)HKJK-6 is 6586.96m in length , and the span is 32m....

The Gaojiashan Railway Tunnel

0
Consisting of works of the first segment and the third segment, Bid Section I Project for Outer Breakwater Reinforcement of Oran Port of Algeria...

A New Upsurge of Civil Construction! Good News from the Sixth Division of the...

0
Recently, the sixth division of East Coast Rail Link (ECRL) has presented good news in bridge construction, tunnel construction, T-beam erection one after another, making a good start for the construction task in 2023, and starting the labor competition themed on “build high-quality projects, ensure safety, and set off a new upsurge of civil construction”.

The HEFEI-WUHAN Passenger Special Railway Line

0
The Macheng-Huangpi Section of Hefei-Wuhan Railway, with the total length of 52km, includes 4,000,000m3 earth and stone works, 5 extra large bridges, 20 large/mediumsized...

Latest article

ECRL Project Achieves the Goal of “Half of the Time, Half of the Tasks”

0
2023 is the "tough year for civil construction" of the East Coast Rail Link (ECRL) project constructed by CHEC, and the project has ushered in the peak of civil construction. Centering on the annual plan of the project and the goal of the labor competition in the first half of the year, Divisions I-VII have comprehensively overfulfilled the goal of "Half of the Time, Half of the Tasks ", which added a bright color to the progress of the project.

The 8 Shenton Way Mixed-use Building Renovation Project in Singapore Starts the Test Pile...

0
Recently, the 8 Shenton Way Mixed-use Building Renovation Project in Singapore, undertaken by CHEC, has successfully entered the stage of test pile concrete pouring.

The Dungun River Super-large Bridge, a Key Control Project of ECRL, Successfully Closed

0
Recently, as the tower crane put the last bucket of concrete in place, ECRL has successfully completed the mid-span closure of the 108m-long continuous beam of the Dungun River Super-large Bridge, and the last "obstacle" of the T beam erection of the ECRL Division 4 has been broken through, and the T beam erection will usher in the important stage of fast construction.

The T-beam Erection of ROB24 Road Bridge of ECRL Division 6 Completed Successfully

0
The ROB24 Road Bridge, 260m long, consists of 12 spans and 72 T beams, including 40m-long T beams for the main line of the overpass railway.

The T-beam Erection of the First Super-large Bridge along the Line of ECRL Successfully...

0
Recently, the T-beam erection of No. 5 super-large bridge in Division 1 of ECRL Project has been successfully completed, marking the completion of T beam erection of the first super-large bridge along the whole line of the project.