Company News

What We Do

Route 8 Ngong Shuen Chau Viaduct, Hong Kong China

0
Ngong Shuen Chau Viaduct (NSCV) is the eastern approach road to the Stonecutters Bridge. Its main road comprises 2.2km of dual 3-lane carriageway connecting...

Projects

The Reclamation Works in Flota, Columbia

0
The reclamation works in Flota, Columbia with a dredged and reclaimed volume of 2.3 million m3.

STAY CONNECTED

654FansLike
179SubscribersSubscribe

Design, Construction and Completion Of The Second Penang Bridge, Package 1- Main Navigation Span...

0
The Proposed Second Penang Bridge (P2B) is Malaysia's largest civil works for the past 20 years. China Harbour is to Design, Construction and Completion of...

Shanghai Donghai Bridge

0
Donghai Bridge stretches 32.5km and is the only road-link to the main land for Yanshan Deep Water Port. The standard width of the bridge...

Reclamation of 1.4 million m2 and shore protection works in Sabah, Malaysia.

0
Reclamation of 1.4 million m2 and shore protection works in Sabah, Malaysia.

Damma Oil Terminal Project, Sudan

Design and construction of -14.6 m oil terminal for 50000 DWT in the structure of boring pile pier foundation, construction of approach embankment with...
Code of Practice

Code of Practice

Chief Executives’ and Board of Directors’ Workplace Safety and Health (WSH) Duties