This project is located at Chittagong Bangladesh. It comprises design and construction of 1000m length quay wall (total 5nos. berth with capacity of 30,000 tons, 200m length for each), 140,000 m2 container storage yard, roads & railways, terminal buildings, potable water & drainage system, electrical distribution and other accessory facilities.
Latest article
CHEC Construction (M) Sdn Bhd has been honourably awarded three ISO certificates of Quality...
CHEC Construction (M) Sdn Bhd has been honourably awarded three ISO certificates of Quality management system, Environmental management system and Occupational health and safety...
Department of Hydraulic Engineering at Tsinghua University
Founded in 1952, the Department of Hydraulic Engineering at Tsinghua University was early known as the Water Conservancy Team of the Department of Civil Engineering.
SAUDI RAS AZ ZAWR PORT EPC PROJECT
The scope of work for this project is Engineering, Procurement and Construction (EPC) of the Port at RasAzZawr, as part of the infrastructure support...
Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities & Reclamation Works
Construction of 6,140m long seawall and reclamation of an area of about 150 hectare at the northeast of the Hong Kong International Airport for...
The Extension of the Main Buildings of the New Ferry Terminal in Taipa
The scale of the construction may include 16 ships loading with 400 people and 3 ships loading with 1200 people. The main contents of...