Breakwater for Costa Azul LNG Terminal, Mexico

0
Design and construction 700m long and 25m water deep breakwater in 300m offshore, installation of 18no. Precast concrete caissons which are 32m wide, 36m...

Gwadar Deep Water Port Project Phase I, Pakistan

0
Gwadar Deep Water Port is a large project in Baluchistan Town, Pakistan. The construction works mainly consists of three multi-purpose berths with 602-meter long...

Saigon International Terminals (Vietnam) Project – SITV

0
Saigon International Terminals (Vietnam) Project (-SITV) is located along the ThiVai River in Phu My Industrial Zone 1, Ba RiaVung Tau Province, Vietnam. This...

Red Sea Gateway Terminal Civil Works, Jeddah, Saudi Arabia

0
The project is mainly constituted by two 100,000-ton main berths, one 50,000-ton feeder berth as well as berth base trough and basin channel dredging...

Mahinda Rajapaksa International Cricket Stadium

0
Hambantota International Cricket Stadium was buit for the 2011 Cricket World Cup and hosted two matches. It has a capacity of 34,300 people and...

Macau Grand Lisboa Hotel

0
Macau Grand Lisboa Hotel, a 228m high, 44-floor building covering 12,000 m2.The total investment for the project was over 3 billion Macao Pacatas and...

One of power experiences was Az-Zour Power (Phase I) in Kuwait

0
CHEC, as one of Chinese pioneers of international contractor, special provides service for infrastructure works including power. With its stronger ability to integrate different sources...

2 new thermal power plants

0
To meet the increasing demand of power supply and the country's economic development needs, the Client is planning to increase the capacity of the...

Latest article

CHEC Construction (M) Sdn Bhd has been honourably awarded three ISO certificates of Quality...

0
CHEC Construction (M) Sdn Bhd has been honourably awarded three ISO certificates of Quality management system, Environmental management system and Occupational health and safety...

Department of Hydraulic Engineering at Tsinghua University

0
Founded in 1952, the Department of Hydraulic Engineering at Tsinghua University was early known as the Water Conservancy Team of the Department of Civil Engineering.

SAUDI RAS AZ ZAWR PORT EPC PROJECT

The scope of work for this project is Engineering, Procurement and Construction (EPC) of the Port at RasAzZawr, as part of the infrastructure support...

Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities & Reclamation Works

Construction of 6,140m long seawall and reclamation of an area of about 150 hectare at the northeast of the Hong Kong International Airport for...

The Extension of the Main Buildings of the New Ferry Terminal in Taipa

The scale of the construction may include 16 ships loading with 400 people and 3 ships loading with 1200 people. The main contents of...