Hong Kong-Zhuhai-Macao Bridge, Hong Kong Link Road – Section between HKSAR Boundary and Scenic...

0
In order to connect the Hong Kong-Zhuhai-Macao Bridge and the SAR traffic system, Hong Kong Special Administrative Region (HKSAR) plans a series of strategic...

Workboat Wharf and Auxiliary Facilities of China-Myanmar Crude Oil Pipeline Project

0
The engineering work in the Made Island, situated at the west coast of Myanmar, takes the lead of the Myanmar-China Crude Oil Pipeline Project,...

A New Upsurge of Civil Construction! Good News from the Sixth Division of the...

0
Recently, the sixth division of East Coast Rail Link (ECRL) has presented good news in bridge construction, tunnel construction, T-beam erection one after another, making a good start for the construction task in 2023, and starting the labor competition themed on “build high-quality projects, ensure safety, and set off a new upsurge of civil construction”.

SAUDI RAS AZ ZAWR PORT EPC PROJECT

The scope of work for this project is Engineering, Procurement and Construction (EPC) of the Port at RasAzZawr, as part of the infrastructure support...

Macao Friendship Bridge

0
Total length of the bridge is 4414m, with 112m main span and 19.3m width. The ramp bridge is 1108m in length. The substructure of the...

Breakwater for Costa Azul LNG Terminal, Mexico

0
Design and construction 700m long and 25m water deep breakwater in 300m offshore, installation of 18no. Precast concrete caissons which are 32m wide, 36m...

Proposed Docks, Wharves, Quays, Piers and Other Ancillary Works In New Yard (Phase 1)...

Scope of works involves the design and construction of 4 dry docks(1#410m*66m、2#、3#350m*66m,4#360m*89m), 4 wharves (total length 1870m), 3 piers (318m*25m), 2 quays (total length...

The Jinjiang Bridge Of The Shanghai-Kunming Railway

0
The Jinjiang Bridge of the Newly constructed Railway of Hangzhou-Changsha(Jiangxi)is 8863.02m in length ,and passing through the yangwei town of gaoan city and huibu...

Red Sea Gateway Terminal Civil Works, Jeddah, Saudi Arabia

0
The project is mainly constituted by two 100,000-ton main berths, one 50,000-ton feeder berth as well as berth base trough and basin channel dredging...

Construction of A Container Terminal at New Mooring, Chittagong, Bangladesh

0
This project is located at Chittagong Bangladesh. It comprises design and construction of 1000m length quay wall (total 5nos. berth with capacity of 30,000...

Latest article

ECRL Section 6 Starts the Erection of the First T-beam for Section C

0
Recently, the CCCC ECRL Section 6 has accurately and smoothly placed the first T-beam for the No. 11 Bridge on the pier, marking a good start of the T-beam erection for Section C under ECRL Section 6.

ECRL Section 6 Starts Laying Tracks for the First Track-laying Section

0
Recently, with the track laying machine rumbling, the sleepers and the tracks slowly fell from the track laying machine in turn. The acceptance and handover of the first track-laying section of the ECRL Section 6 was completed and the track-laying construction started, marking the official entry into the track laying stage of the B Section under ECRL Section 6, 37 days ahead of the original plan.

Deputy Chief Minister of Sarawak Attends the Celebration for the Achievement of 1,500,000 Man-hours...

0
Recently, the celebration for the achievement of 1,500,000 man-hours without LTI of Sarawak No.2 Trunk Road Section B1 Project in Malaysia was held in Sri Aman. Datuk Amar Douglas Uggah Embas - Deputy Chief Minister and Minister for Infrastructure and Port Development of Sarawak, and Richard – Director General of Sarawak Public Works Department (JKR Sarawak) attended the celebration and gave speeches. Local councillors, heads of various divisions of Sarawak Public Works Department, head of Sri Aman Branch head and project leader of JV Company were also present at the celebration.

ECRL Project Successfully Makes the First Turn-around of the Track-laying Unit

0
Recently, as the main engine of the track-laying machine was smoothly lifted back to the track at the special level crossing for the large-scale hoisting at the track-laying base from the axial low flatbed trailer, the CCCC ECRL project has successfully made the first turn-around of the track-laying unit. As a key step of connecting the first and second paving sections of the main line, the smooth turn of the track-laying unit indicates that the project is ready for the start of the long-track laying in the second paving section in advance.

The 275kV Sea-crossing Transmission Line Project in Penang, Malaysia Completes Hoisting of All Offshore...

0
Recently, as the last piece of prefabricated shell for the P9 platform was hoisted and aligned, the 275kV sea-crossing transmission line project in Penang, Malaysia has successfully completed hoisting of all offshore maintenance platforms, laying a foundation for the installation of iron towers along the whole line.