Yangshan Deep Water Port, Phase I, China
Shanghai International Shipping Center-Yangshan Deep Water Harbour Phase I, still under construction. The harbour is being constructed with beams and slabs supported on piles...
Red Sea Gateway Terminal Civil Works, Jeddah, Saudi Arabia
The project is mainly constituted by two 100,000-ton main berths, one 50,000-ton feeder berth as well as berth base trough and basin channel dredging...
A New Upsurge of Civil Construction! Good News from the Sixth Division of the...
Recently, the sixth division of East Coast Rail Link (ECRL) has presented good news in bridge construction, tunnel construction, T-beam erection one after another, making a good start for the construction task in 2023, and starting the labor competition themed on “build high-quality projects, ensure safety, and set off a new upsurge of civil construction”.
Nay Pyi Taw International Airport, Myanmar
This project is located at Nay Pyi Taw, the new capital of Myanmar. It comprises of design, procurement, construction and commissioning of the following...
Hong Kong-Zhuhai-Macao Bridge, Hong Kong Link Road – Section between HKSAR Boundary and Scenic...
In order to connect the Hong Kong-Zhuhai-Macao Bridge and the SAR traffic system, Hong Kong Special Administrative Region (HKSAR) plans a series of strategic...
SAUDI RAS AZ ZAWR PORT EPC PROJECT
The scope of work for this project is Engineering, Procurement and Construction (EPC) of the Port at RasAzZawr, as part of the infrastructure support...
Three Tunnels of ECRL Project Realize Breakthrough on the Same Day
On March 11, reports of new victories in tunnel construction of the ECRL project came. Bentong Tunnel 1 (Tunnel 4#), Temiang Tunnel 1 (Tunnel 12#), Temiang Tunnel 2 (Tunnel 13#) realized breakthrough on the same day. As of that day, 9 of the 11 conventional tunnels built by ECRL Section 7 have been completed.
ECRL Project Successfully Makes the First Turn-around of the Track-laying Unit
Recently, as the main engine of the track-laying machine was smoothly lifted back to the track at the special level crossing for the large-scale hoisting at the track-laying base from the axial low flatbed trailer, the CCCC ECRL project has successfully made the first turn-around of the track-laying unit. As a key step of connecting the first and second paving sections of the main line, the smooth turn of the track-laying unit indicates that the project is ready for the start of the long-track laying in the second paving section in advance.
Port Said East Container Terminal – Phase 2 Marin Works In Egypt
Design and construction of the extension to the existing quay, comprising a 1,200m long southerly extension to the Phase 1 quay, including a full...
The HAERBIN-DALIAN Passenger Special Railway Line
This section of the railway project runs through JIlin, Heilongjiang and lining provinces in Notheeast China with a total length of 345.596km for the...