The project is located in the city of Sinnar Sudan, 5km downstream of Dam of Sinnar.
The work comprises of design and construction of :
- One Reinforced Concrete Highway Bridge (310 m Length and 18.4 m Width) Across Blue Nile,
- One Reinforced Concrete Railway Bridge (310 m Length and 7 m Width) Across Blue Nile,
- Two Reinforced Concrete Railway Bridges (70 m Length and 7 m Width) Across Canal and
- the Road Approaches (1545 m) and the Railway Track (1000 m).