The Second Double Track Lines Of Lanzhou-Xinjiang Railway LSX-1 Section Works

0
Running through northwest part of China’s Gansu,Qinghai provinces and Xinjiang Uygur Autonomous Region,with a total length of 1776km,the design speed of over 200km/h,the second...

Works of Changsha-Kunming High-speed Passenger Railway-Jiangxi Segment HKJX-6

0
This double-track electrified railway of 2066km,with the design speed of 350km/h and a total investment of over 300 billion RMB.Locating at Gao’an,Yichun City Yushui...

C370-Construction Works for Taipa Border Gate Section of Macau LRT

0
The total length of railway is 3075 meters, including 3 newly constructed stations and elevated viaduct in 4 range segments. Supporting facilities such as...

The HEFEI-WUHAN Passenger Special Railway Line

0
The Macheng-Huangpi Section of Hefei-Wuhan Railway, with the total length of 52km, includes 4,000,000m3 earth and stone works, 5 extra large bridges, 20 large/mediumsized...

The HAERBIN-DALIAN Passenger Special Railway Line

0
This section of the railway project runs through JIlin, Heilongjiang and lining provinces in Notheeast China with a total length of 345.596km for the...

The Ampang (AMG) Line Extension Project – Track Works, Malaysia

0
The Ampang (AMG) Line Extension starts from Sri Petaling Station and ends at Putra Heights to serve the highly populated residential and commercial areas....

Nay Pyi Taw International Airport, Myanmar

0
This project is located at Nay Pyi Taw, the new capital of Myanmar. It comprises of design, procurement, construction and commissioning of the following...

Juba International Airport Project Phase I, South Sudan

0
Juba International Airport was built in the 1960s, the original runway is currently used as a taxiway, parking with lots of United Nations’ aircraft,...

The Parking Apron of Pudong International Airport, Shanghai

0
Construction of the parking Apron of Pudong International Airport in Shanghai, to pave 380,000m2 of concrete parking area.

Macao International Airport

0
Macao International Airport was constructed on an artificial reclaimed island created by CHEC. The project was started in March, 1992 with the total contract...

Latest article

ECRL Section 6 Starts the Erection of the First T-beam for Section C

0
Recently, the CCCC ECRL Section 6 has accurately and smoothly placed the first T-beam for the No. 11 Bridge on the pier, marking a good start of the T-beam erection for Section C under ECRL Section 6.

ECRL Section 6 Starts Laying Tracks for the First Track-laying Section

0
Recently, with the track laying machine rumbling, the sleepers and the tracks slowly fell from the track laying machine in turn. The acceptance and handover of the first track-laying section of the ECRL Section 6 was completed and the track-laying construction started, marking the official entry into the track laying stage of the B Section under ECRL Section 6, 37 days ahead of the original plan.

Deputy Chief Minister of Sarawak Attends the Celebration for the Achievement of 1,500,000 Man-hours...

0
Recently, the celebration for the achievement of 1,500,000 man-hours without LTI of Sarawak No.2 Trunk Road Section B1 Project in Malaysia was held in Sri Aman. Datuk Amar Douglas Uggah Embas - Deputy Chief Minister and Minister for Infrastructure and Port Development of Sarawak, and Richard – Director General of Sarawak Public Works Department (JKR Sarawak) attended the celebration and gave speeches. Local councillors, heads of various divisions of Sarawak Public Works Department, head of Sri Aman Branch head and project leader of JV Company were also present at the celebration.

ECRL Project Successfully Makes the First Turn-around of the Track-laying Unit

0
Recently, as the main engine of the track-laying machine was smoothly lifted back to the track at the special level crossing for the large-scale hoisting at the track-laying base from the axial low flatbed trailer, the CCCC ECRL project has successfully made the first turn-around of the track-laying unit. As a key step of connecting the first and second paving sections of the main line, the smooth turn of the track-laying unit indicates that the project is ready for the start of the long-track laying in the second paving section in advance.

The 275kV Sea-crossing Transmission Line Project in Penang, Malaysia Completes Hoisting of All Offshore...

0
Recently, as the last piece of prefabricated shell for the P9 platform was hoisted and aligned, the 275kV sea-crossing transmission line project in Penang, Malaysia has successfully completed hoisting of all offshore maintenance platforms, laying a foundation for the installation of iron towers along the whole line.