This project is located at the Pacific coast city of Manzanillo, 800km away from Mexico City. This construction contract comprises the construction of Phase 1 – Stage 1A container terminal capable of handling approximately 400,000 TEU per annum with the following, but not limited to, general characteristics: 720 m long Quay / Wharf; Approximately 28.5 hectares that includes container storage yard complete with all necessary heavy duty pavements for container handling equipment operations, container stacks, fencing, electrical distribution, lighting, firefighting system, potable water, infrastructure, drainage system, services and facilities required for efficient container terminal operations; and back up area which will allocate terminal buildings such as administration, maintenance workshop, gatehouses, CFS, customs and other support buildings, as well as other operational areas; Intermodal Zone complete with all necessary railings and items for efficient operations.
Home What we do Marine Engineering CMSA Container Terminal Phase 1-Stage 1A Civil Works in Manzanillo, Colima
Latest article
CHEC Construction (M) Sdn Bhd has been honourably awarded three ISO certificates of Quality...
CHEC Construction (M) Sdn Bhd has been honourably awarded three ISO certificates of Quality management system, Environmental management system and Occupational health and safety...
Department of Hydraulic Engineering at Tsinghua University
Founded in 1952, the Department of Hydraulic Engineering at Tsinghua University was early known as the Water Conservancy Team of the Department of Civil Engineering.
SAUDI RAS AZ ZAWR PORT EPC PROJECT
The scope of work for this project is Engineering, Procurement and Construction (EPC) of the Port at RasAzZawr, as part of the infrastructure support...
Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities & Reclamation Works
Construction of 6,140m long seawall and reclamation of an area of about 150 hectare at the northeast of the Hong Kong International Airport for...
The Extension of the Main Buildings of the New Ferry Terminal in Taipa
The scale of the construction may include 16 ships loading with 400 people and 3 ships loading with 1200 people. The main contents of...