The project includes one 35000DWT coal import jetty (234m×25m), two rock hearting with concrete block armour breakwaters , total length is 2105m, dredging quantity is about 2,260,000m3, 431 m long revetment, one water intake, coal transport belt conveyor system.
Home What we do Marine Engineering Maritime Works of PLTU 2 Jateng 1X660MW Adipala Project, Indonesia
Latest article
CHEC Construction (M) Sdn Bhd has been honourably awarded three ISO certificates of Quality...
CHEC Construction (M) Sdn Bhd has been honourably awarded three ISO certificates of Quality management system, Environmental management system and Occupational health and safety...
Department of Hydraulic Engineering at Tsinghua University
Founded in 1952, the Department of Hydraulic Engineering at Tsinghua University was early known as the Water Conservancy Team of the Department of Civil Engineering.
SAUDI RAS AZ ZAWR PORT EPC PROJECT
The scope of work for this project is Engineering, Procurement and Construction (EPC) of the Port at RasAzZawr, as part of the infrastructure support...
Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities & Reclamation Works
Construction of 6,140m long seawall and reclamation of an area of about 150 hectare at the northeast of the Hong Kong International Airport for...
The Extension of the Main Buildings of the New Ferry Terminal in Taipa
The scale of the construction may include 16 ships loading with 400 people and 3 ships loading with 1200 people. The main contents of...