Proposed Docks, Wharves, Quays, Piers and Other Ancillary Works In New Yard (Phase 1) at Tuas South, Singapore for MS Jurong Shipyard Pte Ltd

9282

Scope of works involves the design and construction of 4 dry docks(1#410m*66m、2#、3#350m*66m,4#360m*89m), 4 wharves (total length 1870m), 3 piers (318m*25m), 2 quays (total length 688m)and other ancillary works such as pump houses, pump control room and winch control room