Mubarak Al Kabeer Seaport Project (Phase 1 – stage 1) Road, Bridges and Soil Treatment Works, Kuwait

9958

This project consists of Design, Execution, Completion and Maintenance of:

  1. Temporary Steel Bridge and Approaches at the Subbiyah Mainland Side and Boubyan Island Side
  2. 1.42km Long Highway Bridge over Khor Al-Subbiyah to Boubyan Island;
  3. 4.24km Long Railway Bridge over Khor Al-Subbiyah to connect Boubyan Island to Subbiyah Mainland; and,
  4. 28km Long Railway Embankment and Highway Embankment and Combined Embankments.

The Highway is to be complete with Rip-Rap, Pavement, Street Lighting, Irrigation, Landscaping, Drainage System and Traffic Facilities.