The project is located at the entrance of Sudan Port, planned with 2 nos. 70,000TEU Container Terminal and some dredging works. The total length of the terminal is 781m with -16m water depth. The body is planned to be double-decker hollow concrete cube structure, its revetment is about 1410.81m in length. Dredging for the foundation trench, turning basin, main channel and total dredging volume comes to 3.5million m3.
Latest article
CHEC Construction (M) Sdn Bhd has been honourably awarded three ISO certificates of Quality...
CHEC Construction (M) Sdn Bhd has been honourably awarded three ISO certificates of Quality management system, Environmental management system and Occupational health and safety...
Department of Hydraulic Engineering at Tsinghua University
Founded in 1952, the Department of Hydraulic Engineering at Tsinghua University was early known as the Water Conservancy Team of the Department of Civil Engineering.
SAUDI RAS AZ ZAWR PORT EPC PROJECT
The scope of work for this project is Engineering, Procurement and Construction (EPC) of the Port at RasAzZawr, as part of the infrastructure support...
Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities & Reclamation Works
Construction of 6,140m long seawall and reclamation of an area of about 150 hectare at the northeast of the Hong Kong International Airport for...
The Extension of the Main Buildings of the New Ferry Terminal in Taipa
The scale of the construction may include 16 ships loading with 400 people and 3 ships loading with 1200 people. The main contents of...