The Second Double Track Lines Of Lanzhou-Xinjiang Railway LSX-1 Section Works

0
Running through northwest part of China’s Gansu,Qinghai provinces and Xinjiang Uygur Autonomous Region,with a total length of 1776km,the design speed of over 200km/h,the second...

Linking Kowloon and Tuen Mun in Hong Kong

0
The Northwest Railway is 30.5km long and represents a 51.7billion HK$ investment. At the time of construction it was the largest railway infrastructure project...

C370-Construction Works for Taipa Border Gate Section of Macau LRT

0
The total length of railway is 3075 meters, including 3 newly constructed stations and elevated viaduct in 4 range segments. Supporting facilities such as...

The Gaojiashan Railway Tunnel

0
Consisting of works of the first segment and the third segment, Bid Section I Project for Outer Breakwater Reinforcement of Oran Port of Algeria...

The HEFEI-WUHAN Passenger Special Railway Line

0
The Macheng-Huangpi Section of Hefei-Wuhan Railway, with the total length of 52km, includes 4,000,000m3 earth and stone works, 5 extra large bridges, 20 large/mediumsized...

The Fuchuan Railway Tunnel

0
The fuchuan tunnel of double track Lanzhou-urumchi railway is located in yongjing country in gansu province with the total of 10469m. starting from DK39+730...

The NO.2 Liaojia Super Major Railway Bridge

0
The No.2 Liaojia Super Major Bridge of the Newly constructed Railway of Hangzhou-Changsha(Jiangxi Section)HKJK-6 is 6586.96m in length , and the span is 32m....

The Jinjiang Bridge Of The Shanghai-Kunming Railway

0
The Jinjiang Bridge of the Newly constructed Railway of Hangzhou-Changsha(Jiangxi)is 8863.02m in length ,and passing through the yangwei town of gaoan city and huibu...

The Bapanxia Yellow River Super Major Railway Bridge

0
Located in Yongjing country in Gansu Province,the bridge starts from the exit of the tunnel of double track Lanzhou-urumchi railway to the entrance of...

Lanzhou-Xining Section of Lanzhou-Xinjiang High-speed Railway Project

0
Lanzhou-Xinjiang High-speed Railway which the length is 1776 kms crossing plateau, mountainous region, desert and other complicated landforms and it is also an important...

Latest article

The Sea-crossing Transmission Line Project in Penang Successfully Completes the Installation of the First...

Recently, the first 100m-tall steel tower of the Sea-crossing Transmission Line Project in Penang, Malaysia, has been successfully installed, marking the project starts to install the towers with all its strength.

ECRL Project Holds the Opening Ceremony of the Communications-Signaling-Power-Electrification Systems Engineering

0
Recently, the CCCC ECRL Section 6 has accurately and smoothly placed the first T-beam for the No. 11 Bridge on the pier, marking a good start of the T-beam erection for Section C under ECRL Section 6.

ECRL Section 6 Starts the Erection of the First T-beam for Section C

0
Recently, the CCCC ECRL Section 6 has accurately and smoothly placed the first T-beam for the No. 11 Bridge on the pier, marking a good start of the T-beam erection for Section C under ECRL Section 6.

ECRL Section 6 Starts Laying Tracks for the First Track-laying Section

0
Recently, with the track laying machine rumbling, the sleepers and the tracks slowly fell from the track laying machine in turn. The acceptance and handover of the first track-laying section of the ECRL Section 6 was completed and the track-laying construction started, marking the official entry into the track laying stage of the B Section under ECRL Section 6, 37 days ahead of the original plan.

Deputy Chief Minister of Sarawak Attends the Celebration for the Achievement of 1,500,000 Man-hours...

0
Recently, the celebration for the achievement of 1,500,000 man-hours without LTI of Sarawak No.2 Trunk Road Section B1 Project in Malaysia was held in Sri Aman. Datuk Amar Douglas Uggah Embas - Deputy Chief Minister and Minister for Infrastructure and Port Development of Sarawak, and Richard – Director General of Sarawak Public Works Department (JKR Sarawak) attended the celebration and gave speeches. Local councillors, heads of various divisions of Sarawak Public Works Department, head of Sri Aman Branch head and project leader of JV Company were also present at the celebration.