2 new thermal power plants

8449

To meet the increasing demand of power supply and the country’s economic development needs, the Client is planning to increase the capacity of the present thermal power plants by building 2 new thermal power plants(single 330,000kw) based on the existing 4 thermal power plants(single 330,000kw).

The main purpose of this project is to reconstruct/expand the existing transportation equipment in storage yard of the coal terminal according to the Client’s other reconstruction/expansion projects.

The scope of the work is Engineering, Procurement and Construction (EPC) of belt conveyor with capacity of 2400t/h and stacker with capacity of 4800t/h, and other accessory equipment such as electrical system, control system, firefighting system, air conditioning system, water supply and drainage system, communication system and de-dusting system. The capacity of the existing coal transportation system shall be improved up to a rated power of 4800 t/H after completion of this project.