Jetty Works of PLTU 3 JAWA TIMUR(2×350MW)TANJUNG AWAR-AWAR POWER PLANT
The project includes one 12000DWT Gravity caisson coal import jetty (193m×25m), two rock hearting with concrete block armour breakwaters arranged as an encircled ring...
Grn, Port of Lobito Extension Project Mineral Terminal
Extension Work--Mineral Terminal is located in Lobito, Angola. The length is 310 meters. Mineral Terminal includes 19 caissons which size is 18.7mx14.3mx17.3m and single...
GRN, Port of Lobito Extension Project Container Terminal
Extension Work--Container Terminal is located in Lobito, Angola. The length is 414 meters. Container Terminal includes 621 steel pipe piles, and the superstructure is...
EPC Contract for JUBA-NIMULE standard gauge railway
The construction of the railway line starts from south of Juba southward in South Sudan, all the way to the border city Nimule, with...
The Gaojiashan Railway Tunnel
Consisting of works of the first segment and the third segment, Bid Section I Project for Outer Breakwater Reinforcement of Oran Port of Algeria...
The Fuchuan Railway Tunnel
The fuchuan tunnel of double track Lanzhou-urumchi railway is located in yongjing country in gansu province with the total of 10469m. starting from DK39+730...
The Bapanxia Yellow River Super Major Railway Bridge
Located in Yongjing country in Gansu Province,the bridge starts from the exit of the tunnel of double track Lanzhou-urumchi railway to the entrance of...
The Jinjiang Bridge Of The Shanghai-Kunming Railway
The Jinjiang Bridge of the Newly constructed Railway of Hangzhou-Changsha(Jiangxi)is 8863.02m in length ,and passing through the yangwei town of gaoan city and huibu...
The NO.2 Liaojia Super Major Railway Bridge
The No.2 Liaojia Super Major Bridge of the Newly constructed Railway of Hangzhou-Changsha(Jiangxi Section)HKJK-6 is 6586.96m in length , and the span is 32m....
The Second Double Track Lines Of Lanzhou-Xinjiang Railway LSX-1 Section Works
Running through northwest part of China’s Gansu,Qinghai provinces and Xinjiang Uygur Autonomous Region,with a total length of 1776km,the design speed of over 200km/h,the second...