Works of Changsha-Kunming High-speed Passenger Railway-Jiangxi Segment HKJX-6

0
This double-track electrified railway of 2066km,with the design speed of 350km/h and a total investment of over 300 billion RMB.Locating at Gao’an,Yichun City Yushui...

C370-Construction Works for Taipa Border Gate Section of Macau LRT

0
The total length of railway is 3075 meters, including 3 newly constructed stations and elevated viaduct in 4 range segments. Supporting facilities such as...

The HEFEI-WUHAN Passenger Special Railway Line

0
The Macheng-Huangpi Section of Hefei-Wuhan Railway, with the total length of 52km, includes 4,000,000m3 earth and stone works, 5 extra large bridges, 20 large/mediumsized...

The HAERBIN-DALIAN Passenger Special Railway Line

0
This section of the railway project runs through JIlin, Heilongjiang and lining provinces in Notheeast China with a total length of 345.596km for the...

The Ampang (AMG) Line Extension Project – Track Works, Malaysia

0
The Ampang (AMG) Line Extension starts from Sri Petaling Station and ends at Putra Heights to serve the highly populated residential and commercial areas....

Nay Pyi Taw International Airport, Myanmar

0
This project is located at Nay Pyi Taw, the new capital of Myanmar. It comprises of design, procurement, construction and commissioning of the following...

Juba International Airport Project Phase I, South Sudan

0
Juba International Airport was built in the 1960s, the original runway is currently used as a taxiway, parking with lots of United Nations’ aircraft,...

The Parking Apron of Pudong International Airport, Shanghai

0
Construction of the parking Apron of Pudong International Airport in Shanghai, to pave 380,000m2 of concrete parking area.

Macao International Airport

0
Macao International Airport was constructed on an artificial reclaimed island created by CHEC. The project was started in March, 1992 with the total contract...

Sonaref Refinery Project Dredging for Marine Facilities, Angola

Dredging in a trapezoid area about 2000m long and 300m wide at the maximum width location, excavating the specified area a 15 meter deep...

Latest article

CHEC Construction (M) Sdn Bhd has been honourably awarded three ISO certificates of Quality...

0
CHEC Construction (M) Sdn Bhd has been honourably awarded three ISO certificates of Quality management system, Environmental management system and Occupational health and safety...

Department of Hydraulic Engineering at Tsinghua University

0
Founded in 1952, the Department of Hydraulic Engineering at Tsinghua University was early known as the Water Conservancy Team of the Department of Civil Engineering.

SAUDI RAS AZ ZAWR PORT EPC PROJECT

The scope of work for this project is Engineering, Procurement and Construction (EPC) of the Port at RasAzZawr, as part of the infrastructure support...

Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities & Reclamation Works

Construction of 6,140m long seawall and reclamation of an area of about 150 hectare at the northeast of the Hong Kong International Airport for...

The Extension of the Main Buildings of the New Ferry Terminal in Taipa

The scale of the construction may include 16 ships loading with 400 people and 3 ships loading with 1200 people. The main contents of...