Jamaica Development Infrastructure Programmer(JDIP)

0
Included in projects of the 400 million loan framework, this project is the expansion of the national road corridors and re-construction of the existing...

The NO.2 Liaojia Super Major Railway Bridge

0
The No.2 Liaojia Super Major Bridge of the Newly constructed Railway of Hangzhou-Changsha(Jiangxi Section)HKJK-6 is 6586.96m in length , and the span is 32m....

Cameroon Kribi Deep Sea Port

0
Cameroon Kribi Deep Sea Port is located on the western coast of Africa, 30Km away from Kribi city of Cameroon. The dredging works of this...

The 275kV Sea-crossing Transmission Line Project in Penang, Malaysia Completes the Installation of the...

0
Recently, with the successful lifting and alignment of the last section of the P16 pier tower and the completion of bolt tightening, the 275kV Sea-crossing Transmission Line Project in Penang, Malaysia has successfully completed the complete installation of the first iron tower, marking the project’s full entry into the iron tower installation stage.

Port Said East Container Terminal – Phase 2 Marin Works In Egypt

0
Design and construction of the extension to the existing quay, comprising a 1,200m long southerly extension to the Phase 1 quay, including a full...

The Bapanxia Yellow River Super Major Railway Bridge

0
Located in Yongjing country in Gansu Province,the bridge starts from the exit of the tunnel of double track Lanzhou-urumchi railway to the entrance of...

Damma Oil Terminal Project, Sudan

Design and construction of -14.6 m oil terminal for 50000 DWT in the structure of boring pile pier foundation, construction of approach embankment with...

Lamma Island Power Station in HongKong

0
This Project comprises of dredging of existing navigation channel leading to the HEC Lama Power Station Quay. Dredged level is -16.0m PD.

Yangshan Deep Water Port, Phase I, China

0
Shanghai International Shipping Center-Yangshan Deep Water Harbour Phase I, still under construction. The harbour is being constructed with beams and slabs supported on piles...

Macau Grand Lisboa Hotel

0
Macau Grand Lisboa Hotel, a 228m high, 44-floor building covering 12,000 m2.The total investment for the project was over 3 billion Macao Pacatas and...

Latest article

ECRL Section 6 Starts the Erection of the First T-beam for Section C

0
Recently, the CCCC ECRL Section 6 has accurately and smoothly placed the first T-beam for the No. 11 Bridge on the pier, marking a good start of the T-beam erection for Section C under ECRL Section 6.

ECRL Section 6 Starts Laying Tracks for the First Track-laying Section

0
Recently, with the track laying machine rumbling, the sleepers and the tracks slowly fell from the track laying machine in turn. The acceptance and handover of the first track-laying section of the ECRL Section 6 was completed and the track-laying construction started, marking the official entry into the track laying stage of the B Section under ECRL Section 6, 37 days ahead of the original plan.

Deputy Chief Minister of Sarawak Attends the Celebration for the Achievement of 1,500,000 Man-hours...

0
Recently, the celebration for the achievement of 1,500,000 man-hours without LTI of Sarawak No.2 Trunk Road Section B1 Project in Malaysia was held in Sri Aman. Datuk Amar Douglas Uggah Embas - Deputy Chief Minister and Minister for Infrastructure and Port Development of Sarawak, and Richard – Director General of Sarawak Public Works Department (JKR Sarawak) attended the celebration and gave speeches. Local councillors, heads of various divisions of Sarawak Public Works Department, head of Sri Aman Branch head and project leader of JV Company were also present at the celebration.

ECRL Project Successfully Makes the First Turn-around of the Track-laying Unit

0
Recently, as the main engine of the track-laying machine was smoothly lifted back to the track at the special level crossing for the large-scale hoisting at the track-laying base from the axial low flatbed trailer, the CCCC ECRL project has successfully made the first turn-around of the track-laying unit. As a key step of connecting the first and second paving sections of the main line, the smooth turn of the track-laying unit indicates that the project is ready for the start of the long-track laying in the second paving section in advance.

The 275kV Sea-crossing Transmission Line Project in Penang, Malaysia Completes Hoisting of All Offshore...

0
Recently, as the last piece of prefabricated shell for the P9 platform was hoisted and aligned, the 275kV sea-crossing transmission line project in Penang, Malaysia has successfully completed hoisting of all offshore maintenance platforms, laying a foundation for the installation of iron towers along the whole line.