Reclamation of 1.4 million m2 and shore protection works in Sabah, Malaysia.

0
Reclamation of 1.4 million m2 and shore protection works in Sabah, Malaysia.

Damma Oil Terminal Project, Sudan

Design and construction of -14.6 m oil terminal for 50000 DWT in the structure of boring pile pier foundation, construction of approach embankment with...

Cameroon Kribi Deep Sea Port

0
Cameroon Kribi Deep Sea Port is located on the western coast of Africa, 30Km away from Kribi city of Cameroon. The dredging works of this...

Gwadar Deep Water Port Project Phase I, Pakistan

0
Gwadar Deep Water Port is a large project in Baluchistan Town, Pakistan. The construction works mainly consists of three multi-purpose berths with 602-meter long...

The Ampang (AMG) Line Extension Project – Track Works, Malaysia

0
The Ampang (AMG) Line Extension starts from Sri Petaling Station and ends at Putra Heights to serve the highly populated residential and commercial areas....

Juba International Airport Project Phase I, South Sudan

0
Juba International Airport was built in the 1960s, the original runway is currently used as a taxiway, parking with lots of United Nations’ aircraft,...

Breakwater for Costa Azul LNG Terminal, Mexico

0
Design and construction 700m long and 25m water deep breakwater in 300m offshore, installation of 18no. Precast concrete caissons which are 32m wide, 36m...

Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Crossing Facilities & Reclamation Works

Construction of 6,140m long seawall and reclamation of an area of about 150 hectare at the northeast of the Hong Kong International Airport for...

Macau Grand Lisboa Hotel

0
Macau Grand Lisboa Hotel, a 228m high, 44-floor building covering 12,000 m2.The total investment for the project was over 3 billion Macao Pacatas and...

Construction of A Container Terminal at New Mooring, Chittagong, Bangladesh

0
This project is located at Chittagong Bangladesh. It comprises design and construction of 1000m length quay wall (total 5nos. berth with capacity of 30,000...

Latest article

ECRL Section 6 Starts the Erection of the First T-beam for Section C

0
Recently, the CCCC ECRL Section 6 has accurately and smoothly placed the first T-beam for the No. 11 Bridge on the pier, marking a good start of the T-beam erection for Section C under ECRL Section 6.

ECRL Section 6 Starts Laying Tracks for the First Track-laying Section

0
Recently, with the track laying machine rumbling, the sleepers and the tracks slowly fell from the track laying machine in turn. The acceptance and handover of the first track-laying section of the ECRL Section 6 was completed and the track-laying construction started, marking the official entry into the track laying stage of the B Section under ECRL Section 6, 37 days ahead of the original plan.

Deputy Chief Minister of Sarawak Attends the Celebration for the Achievement of 1,500,000 Man-hours...

0
Recently, the celebration for the achievement of 1,500,000 man-hours without LTI of Sarawak No.2 Trunk Road Section B1 Project in Malaysia was held in Sri Aman. Datuk Amar Douglas Uggah Embas - Deputy Chief Minister and Minister for Infrastructure and Port Development of Sarawak, and Richard – Director General of Sarawak Public Works Department (JKR Sarawak) attended the celebration and gave speeches. Local councillors, heads of various divisions of Sarawak Public Works Department, head of Sri Aman Branch head and project leader of JV Company were also present at the celebration.

ECRL Project Successfully Makes the First Turn-around of the Track-laying Unit

0
Recently, as the main engine of the track-laying machine was smoothly lifted back to the track at the special level crossing for the large-scale hoisting at the track-laying base from the axial low flatbed trailer, the CCCC ECRL project has successfully made the first turn-around of the track-laying unit. As a key step of connecting the first and second paving sections of the main line, the smooth turn of the track-laying unit indicates that the project is ready for the start of the long-track laying in the second paving section in advance.

The 275kV Sea-crossing Transmission Line Project in Penang, Malaysia Completes Hoisting of All Offshore...

0
Recently, as the last piece of prefabricated shell for the P9 platform was hoisted and aligned, the 275kV sea-crossing transmission line project in Penang, Malaysia has successfully completed hoisting of all offshore maintenance platforms, laying a foundation for the installation of iron towers along the whole line.