Mubarak Al Kabeer Seaport Project (Phase 1 – stage 1) Road, Bridges and Soil...

0
This project consists of Design, Execution, Completion and Maintenance of: Temporary Steel Bridge and Approaches at the Subbiyah Mainland Side and Boubyan Island Side ...

Qatar Doha New Port Basin and Inner Breakwater Construction Project (NPP)

NPP is a Dig-interior port, including container terminal, general cargo, vehicle terminal, flour terminal, livestock terminal, coastguard terminal and cruise terminal. The method adopted...

Hambantota Port Development Project (Phase I)

0
The Project comprises the construction of Stage 1 of the Port of Hambantota as a services and industrial port on the southern coast of...

Strategic Grain Reserve in Fujairah, UAE

0
The project of Strategic Grain Reserve (SGR) in Fujairah, UAE is close to Port of Fujairah (PoF). This project is EPC project and mainly...

Construction of the Basic Infrastructure of the Kribi Deep Sea Port Project, Cameroon

The Kribi Deep Sea Port is located in southwest of Cameroon, which is 30km south of the city of Kribi. The project cost is...

Southern Transport Development Project Package 1 of Sri Lanka

0
Southern Transport Development is the first highway project as required by Sri Lanka’s City Overall Development Strategy. It is located southwest of Sri Lanka...

The Reclamation Works in Flota, Columbia

0
The reclamation works in Flota, Columbia with a dredged and reclaimed volume of 2.3 million m3.

Route 8 Ngong Shuen Chau Viaduct, Hong Kong China

0
Ngong Shuen Chau Viaduct (NSCV) is the eastern approach road to the Stonecutters Bridge. Its main road comprises 2.2km of dual 3-lane carriageway connecting...

The Parking Apron of Pudong International Airport, Shanghai

0
Construction of the parking Apron of Pudong International Airport in Shanghai, to pave 380,000m2 of concrete parking area.

Latest article

ECRL Section 6 Starts the Erection of the First T-beam for Section C

0
Recently, the CCCC ECRL Section 6 has accurately and smoothly placed the first T-beam for the No. 11 Bridge on the pier, marking a good start of the T-beam erection for Section C under ECRL Section 6.

ECRL Section 6 Starts Laying Tracks for the First Track-laying Section

0
Recently, with the track laying machine rumbling, the sleepers and the tracks slowly fell from the track laying machine in turn. The acceptance and handover of the first track-laying section of the ECRL Section 6 was completed and the track-laying construction started, marking the official entry into the track laying stage of the B Section under ECRL Section 6, 37 days ahead of the original plan.

Deputy Chief Minister of Sarawak Attends the Celebration for the Achievement of 1,500,000 Man-hours...

0
Recently, the celebration for the achievement of 1,500,000 man-hours without LTI of Sarawak No.2 Trunk Road Section B1 Project in Malaysia was held in Sri Aman. Datuk Amar Douglas Uggah Embas - Deputy Chief Minister and Minister for Infrastructure and Port Development of Sarawak, and Richard – Director General of Sarawak Public Works Department (JKR Sarawak) attended the celebration and gave speeches. Local councillors, heads of various divisions of Sarawak Public Works Department, head of Sri Aman Branch head and project leader of JV Company were also present at the celebration.

ECRL Project Successfully Makes the First Turn-around of the Track-laying Unit

0
Recently, as the main engine of the track-laying machine was smoothly lifted back to the track at the special level crossing for the large-scale hoisting at the track-laying base from the axial low flatbed trailer, the CCCC ECRL project has successfully made the first turn-around of the track-laying unit. As a key step of connecting the first and second paving sections of the main line, the smooth turn of the track-laying unit indicates that the project is ready for the start of the long-track laying in the second paving section in advance.

The 275kV Sea-crossing Transmission Line Project in Penang, Malaysia Completes Hoisting of All Offshore...

0
Recently, as the last piece of prefabricated shell for the P9 platform was hoisted and aligned, the 275kV sea-crossing transmission line project in Penang, Malaysia has successfully completed hoisting of all offshore maintenance platforms, laying a foundation for the installation of iron towers along the whole line.