Reconstruction and Improvement of Tuen Mun Road – Sam Shing Hui Section, Hong Kong

0
The works include the demolition of the existing pier and construction of a reinforced concrete pier with a roof cover at Sha Tau Kok....

C370-Construction Works for Taipa Border Gate Section of Macau LRT

0
The total length of railway is 3075 meters, including 3 newly constructed stations and elevated viaduct in 4 range segments. Supporting facilities such as...

CMSA Container Terminal Phase 1-Stage 1A Civil Works in Manzanillo, Colima

This project is located at the Pacific coast city of Manzanillo, 800km away from Mexico City. This construction contract comprises the construction of Phase...

The Fuchuan Railway Tunnel

0
The fuchuan tunnel of double track Lanzhou-urumchi railway is located in yongjing country in gansu province with the total of 10469m. starting from DK39+730...

The HEFEI-WUHAN Passenger Special Railway Line

0
The Macheng-Huangpi Section of Hefei-Wuhan Railway, with the total length of 52km, includes 4,000,000m3 earth and stone works, 5 extra large bridges, 20 large/mediumsized...

The NO.2 Liaojia Super Major Railway Bridge

0
The No.2 Liaojia Super Major Bridge of the Newly constructed Railway of Hangzhou-Changsha(Jiangxi Section)HKJK-6 is 6586.96m in length , and the span is 32m....

The Jinjiang Bridge Of The Shanghai-Kunming Railway

0
The Jinjiang Bridge of the Newly constructed Railway of Hangzhou-Changsha(Jiangxi)is 8863.02m in length ,and passing through the yangwei town of gaoan city and huibu...

Lanzhou-Xining Section of Lanzhou-Xinjiang High-speed Railway Project

0
Lanzhou-Xinjiang High-speed Railway which the length is 1776 kms crossing plateau, mountainous region, desert and other complicated landforms and it is also an important...

The Bapanxia Yellow River Super Major Railway Bridge

0
Located in Yongjing country in Gansu Province,the bridge starts from the exit of the tunnel of double track Lanzhou-urumchi railway to the entrance of...

The HAERBIN-DALIAN Passenger Special Railway Line

0
This section of the railway project runs through JIlin, Heilongjiang and lining provinces in Notheeast China with a total length of 345.596km for the...

Latest article

ECRL Section 6 Starts the Erection of the First T-beam for Section C

0
Recently, the CCCC ECRL Section 6 has accurately and smoothly placed the first T-beam for the No. 11 Bridge on the pier, marking a good start of the T-beam erection for Section C under ECRL Section 6.

ECRL Section 6 Starts Laying Tracks for the First Track-laying Section

0
Recently, with the track laying machine rumbling, the sleepers and the tracks slowly fell from the track laying machine in turn. The acceptance and handover of the first track-laying section of the ECRL Section 6 was completed and the track-laying construction started, marking the official entry into the track laying stage of the B Section under ECRL Section 6, 37 days ahead of the original plan.

Deputy Chief Minister of Sarawak Attends the Celebration for the Achievement of 1,500,000 Man-hours...

0
Recently, the celebration for the achievement of 1,500,000 man-hours without LTI of Sarawak No.2 Trunk Road Section B1 Project in Malaysia was held in Sri Aman. Datuk Amar Douglas Uggah Embas - Deputy Chief Minister and Minister for Infrastructure and Port Development of Sarawak, and Richard – Director General of Sarawak Public Works Department (JKR Sarawak) attended the celebration and gave speeches. Local councillors, heads of various divisions of Sarawak Public Works Department, head of Sri Aman Branch head and project leader of JV Company were also present at the celebration.

ECRL Project Successfully Makes the First Turn-around of the Track-laying Unit

0
Recently, as the main engine of the track-laying machine was smoothly lifted back to the track at the special level crossing for the large-scale hoisting at the track-laying base from the axial low flatbed trailer, the CCCC ECRL project has successfully made the first turn-around of the track-laying unit. As a key step of connecting the first and second paving sections of the main line, the smooth turn of the track-laying unit indicates that the project is ready for the start of the long-track laying in the second paving section in advance.

The 275kV Sea-crossing Transmission Line Project in Penang, Malaysia Completes Hoisting of All Offshore...

0
Recently, as the last piece of prefabricated shell for the P9 platform was hoisted and aligned, the 275kV sea-crossing transmission line project in Penang, Malaysia has successfully completed hoisting of all offshore maintenance platforms, laying a foundation for the installation of iron towers along the whole line.